CERN AD/ELENA DIGITAL TWIN
Initializing 3D environment...
CERN AD/ELENA Antimatter Facility — Digital Twin
L. Olos
Cost
CHF 142.2M
Shielding
25,965 t
Power
1.51 MW
Footprint
5,210 m²
AD
60.02 m (racetrack)
ELENA ∅
9.68 m (hexagonal)
Display
Cross-Section
Ghost Mode
Labels
Animate Beams
Layers
Shielding
Equipment
Camera
Orbit View
Top View
Side View
Inside Tunnel
ELENA Close-up
Experiment Hall
×
AD Beamline
ELENA Ring
Dipole Magnets
Experiment Halls
Concrete Shielding