Evolution Dashboard

Live metrics from the FDRP self-evolving pipeline. Six interactive pages tracking methods, effectiveness, convergence, experiments, and timeline across 58 production runs.

76/76
Figure Quality
96.4%
Convergence
21
Pages Reviewed
Active
Token Auth
2
Known Gaps
104
Methods
Open Full Dashboard

Release Readiness

Checklist of deliverables for the companion website release. Updated 2026-03-18.

Deliverables 13 / 15 complete
  • DONE SVG figure print quality -- 76/76 pass at 8pt minimum (A4) Includes 5 D2 re-renders: fig-035, 036, 038, 040, 041
  • DONE Token authentication system deployed HMAC-SHA256, 14-day tokens, PHP validator at /auth/
  • DONE Gated landing pages created /cern/, /data/, /technical-report/ -- all with index.html
  • DONE Website editorial review -- 11 bugs fixed Numbers, meta tags, copy button, links corrected across 21 pages
  • DONE File ownership corrected All files web100:client2, zero root-owned
  • DONE Gallery SVG permissions fixed Re-rendered D2 figures accessible
  • DONE Cloudflare cache resolved style.css 404 fixed after cache expiry
  • DONE Pipeline convergence at 96.4% Cross-model verified: Claude 100%, Codex 96.4%, Gemini 100%
  • DONE 104 methods catalogued Full method registry with category breakdown and detection coverage
  • DONE URL-to-expand figure links in paper Companion website section added to paper
  • DONE fig-036 decision landscape redesign Split into 3 sub-figures (a/b/c), all pass 8pt minimum at A4
  • PEND /data/ section -- actual datasets Currently placeholder "Coming soon" page, no datasets published
  • PEND /technical-report/ section -- full report Currently placeholder only, no report content
  • DONE Paper PDF regeneration with token-bearing URLs Regenerated with HMAC token-authenticated companion website links
  • STALE Dashboard evolution.html refresh Source 8h+ stale, needs rebuild from latest data

Known Gaps

Items blocking or degrading the release. Ordered by severity.

G2
/data/ section has no datasets The gated page exists but contains only a placeholder. No JSONL, CSV, or query endpoints are published yet.
HIGH
G3
/technical-report/ section is empty Landing page created but no report content. Needs the full technical report PDF or HTML rendering.
HIGH
G1
fig-036 decision landscape too dense Passes 8pt minimum but visual density makes it hard to parse at A4. Structural redesign in progress.
MEDIUM
G4
Paper PDF needs token-bearing URLs Current PDF has bare companion-website URLs. Needs regeneration with HMAC tokens embedded.
MEDIUM
G5
Dashboard evolution.html is stale The interactive 6-page dashboard was last built 8+ hours ago. Data has changed since then.
LOW

Latest Session

Work completed in the current release-prep session.

2026-03-18 release-prep
  • 76 SVG figures verified at print quality (8pt min at A4)
  • 5 D2 figures re-rendered with boosted fonts (fig-035, 036, 038, 040, 041)
  • Token auth system deployed (HMAC-SHA256, 14-day, /auth/)
  • 3 gated landing pages created (cern/, data/, technical-report/)
  • Website editorial review: 21 pages, 11 bugs fixed
  • File ownership corrected to web100:client2 across site
  • Gallery SVG permissions fixed for D2 re-renders
  • Cloudflare 404 cache for style.css resolved

Dashboard Pages

Last updated: 2026-03-18T14:00:00Z