Roadmap
FDRP roadmap — 96 prioritized work items across 13 client tracks plus FDRP-core infrastructure. Every item carries a WSJF score (Cost of Delay ÷ Job Size). Live WSJF-ranked queue lives on the operations dashboard; this page is the narrative summary.
Status overview
Counts reflect roadmap_items as of 10 May 2026. Click any card to drill into the live dashboard.
Top 5 in-flight (by WSJF)
Currently executing. Highest Cost-of-Delay-to-Effort ratio leads.
-
SCOPE-IX-REVISED-P1Scope IX MLM Phase 1 — reductionist via R1029 PEAR (3 ALTERs + view + 3 BIND-MLM rules + manager-persona) WSJF 14.0 -
WAVE-R15-PPCIL-V1Per-Project Context Isolation Layer (Sugiyama L0–L3) WSJF 6.5 -
WAVE-R18-DAFC-V1Destructive-Action Fractal Confirmation — N-deep cognitive reframe before destructive actions WSJF 6.5 -
TOKEN-ATTRIBUTION-V1Per-project token-cost attribution (4 tables + 4 ingesters + 7 views) WSJF 5.6 -
PS-S6E4-EXP-8-GPT55-DRIVEN-V1PS-S6E4 EXP-8: GPT-5.5 main driver + Gemini red-team — 6 kernels for 2026-04-28 WSJF 5.5
Top 5 queued next (by WSJF)
Pulled into in-flight when a slot opens. Order is recomputed on every SEED.
-
WAVE-R13-PCRC-OPTIMIZER-V1Wave R13 — PCRC (Performance-Cost-Reuse-Compound) Optimization Layer V1 WSJF 13.5 -
LIH-MONDAY-DISCOVERYConfirm LIH Monday discovery meeting WSJF 12.0 -
R19-4-SLASH-PARITYR19-4 SLASH-PARITY — 3 wrappers over skill_registry + agent_dispatch_table for Ruflo-style UX pre-R19 WSJF 11.0 -
EMAAR-D5-SUSTAINABILITY-SENDSend D5 Sustainability draft to Emaar CSO (Climate Law cliff) WSJF 8.5 -
SIMTEL-DEBRIEF-CAPTUREFill SIMTEL 1.5h meeting debrief placeholder (evidence-decay) WSJF 8.0
Recent shipments
Last 5 items moved to shipped, ordered by ship date.
-
WAVE-R16-DECISION-3-BENCHMARK-FIRST-GATEWave R16 D-3 outcome: benchmark-first gate ADOPT -
WAVE-R16-DECISION-2-C2INTEGRATION-OUTCOMEWave R16 D-2 outcome: concept2integration KEEP_WITH_KNOWN_LIMITATIONS -
WAVE-R16-TESTING-TIER-FRAMEWORK-V1Wave R16 — Token-Economic Testing-Tier Framework + 4 RLM decision verdicts (WSJF 6.0) -
MULTI-ACCOUNT-ORCHESTRATION-V1Multi-account Claude fault-tolerant orchestration substrate (WSJF 4.75) -
PS-S6E4-EXP-7-PRESTAGEPS-S6E4 EXP-7 pre-stage shipped: 10 Kaggle kernels (4xT-sweep + 2xNM + 2xCTGAN-FE + ensemble + safety)
Want the full picture?
The live WSJF-ranked Cytoscape DAG renders all 96 items with dependency edges, status colours, and gate states. Updated on every SEED.
Open live roadmap dashboard Cycles dashboardHow the roadmap works
FDRP runs gate-driven, not waterfall. Every work item enters the queue with a WSJF score — (business value + time criticality + risk reduction) ÷ job size — and only the highest-ranked items pull into in-flight. Once in flight, an item passes through SEED → PROBE → BUILD → VERIFY → LAND gates, each with explicit acceptance criteria.
Status classes are explicit: queued (not yet started), in_flight (active wave), shipped (gates closed, deployed), blocked (external dependency), held (paused by decision), deferred (re-prioritised down-queue). The live dashboard is the source of truth; this narrative page is regenerated against it.
Cross-model verification (Claude Opus + GPT-5.4 + Gemini 3.1) governs every non-trivial decision. Effectiveness is tracked in the cycles ledger, where each shipped item links back to its evidence chain.
Last updated: · data source: roadmap_items (96 rows)